How to build an AS9100 engineering change control workflow in Plane

See how aerospace and defense engineering teams can build a traceable AS9100 change control workflow in Plane

Sneha Kanojia
●
24 Nov, 2026
Cover image illustration for the blog post titled "How to build an AS9100 engineering change control workflow in Plane"

An approved engineering change, a released drawing, and authorization to implement represent distinct control points. For aerospace and defense organizations, managing those distinctions requires defined approval authority, configuration traceability, verified implementation conditions, and records that can withstand scrutiny.

Here's how to set up AS9100 engineering change control in Plane Enterprise Grid, from ECR intake and technical reviews to approval restrictions, ECO implementation, and evidence tracking, including where existing PLM and QMS controls come into play.

What AS9100 engineering change control has to cover

The workflow in this guide covers five stages of a change, each with its own section below, plus the visibility that keeps every open change on track.

Stage
What the record has to show
Plane Enterprise Grid capability

1. Identify the change and the affected configuration

A unique change record tied to the part, revision, and originating issue

ECR Work Item Type with mandatory custom properties

2. Assess the impact before the decision

Completed assessments from every function relevant to the change

Assessment sub-work items, relations, and dependencies

3. Authorize the change through named approvers

Identified approvers and a recorded authorization

Governed workflows, transition permissions, and approval flows

4. Implement against the released configuration

Implementation tied to the released revision and its effectivity

Linked ECO Work Item Type, transition conditions, and blocking relations

5. Verify the change and retain the evidence

Verification records and traceability from issue to release

Verification tasks, work item activity, workflow change history, and audit logs

6. Keep every open change visible

A current view of each change by stage, owner, and what is holding it

Saved views, PQL, dashboards, and audit logs

Treat the configuration as a starting point to adapt to your own change procedure, design responsibilities, and contract requirements. Design changes and production process changes often follow different procedures and decision authorities, and each can run as its own work item type and workflow in the same workspace.

For how Plane coordinates this kind of work alongside PLM and QMS across a whole program, see how aerospace organizations run program management on Plane.

Identify the change and the affected configuration

Every change starts with a record that pins down what is changing, why, and which configuration it touches, and every assessment after that depends on the record pointing at the right part and revision.

Take a fictional aerospace manufacturer working through an assembly fit-up issue on actuator mounting bracket BRK-204, recorded as NCR-014. Engineering proposes a new mounting-hole pattern that would move the drawing from Rev C to Rev D, and the proposal enters the workflow as ECR-027. All identifiers in this example are illustrative.

Configure an ECR Work Item Type

On Enterprise Grid, a Workspace Admin defines the ECR once at the workspace level and makes it available to the engineering projects that need it.

  1. Go to Workspace Settings > Work item types and turn on Turn on work item types for this workspace. It stays on once enabled. Workspaces that already use project-level types see a Migrate option instead, which moves those types into the workspace library.
  2. Create a type named Engineering Change Request (ECR) and add its custom properties on the Properties tab. New types start inactive, so switch the ECR type on once it's set up.
  3. Mark the intake fields as mandatory, so teams provide the required values when creating or updating the ECR's custom properties. Set them before teams start raising ECRs, and use the Single line format for mandatory text properties.
  4. Set the Rollout type on the type's Governance tab, which appears once Workspace Governance is on.

Choose a rollout type

  • None (default): Project Admins import the ECR type through Project Settings > Work item types > Import from workspace.
  • Seed: The ECR type is added to every new project automatically, which suits ECRs in new programs.
  • Mandatory: The ECR type is added to every project immediately, including existing ones, and Project Admins cannot remove it. This mode suits organizations that want one ECR definition across all programs.

Define the ECR properties

For BRK-204, the ECR could carry the properties that identify the change, its affected configuration, and its initial review needs:

ECR property
Property type
Example value

ECR reference

Text

ECR-027

Affected part

Text

BRK-204

Current revision

Text

Rev C

Proposed revision

Text

Rev D

Change source

Text

NCR-014

Change classification

Dropdown

Classification defined by your procedure

Safety impact

Dropdown

Initial assessment

Customer impact

Dropdown

Initial assessment

Controlled drawing

URL

Link to the Rev C drawing in PLM

The work item description holds the change proposal itself. Plane gives every work item a native ID built from the project identifier and a sequence number, so ECR-027 lives in a property as the business reference your procedure uses.

Keep the source record in its own process

The ECR links to NCR-014 and to the controlled Rev C drawing. NCR-014 continues through your nonconformance disposition process in the QMS, and the ECR carries the design change proposal that grew out of it.

For the full setup, see Plane's Workspace Work Item Types documentation.

Assess the impact before the decision

A new hole pattern on a bracket is a structural question, a tooling question, an inspection question, and a supplier question at the same time, and the decision waits until each function has answered its part.

Assign an assessment to each affected function

Create a sub-work item under the ECR for each function that needs to review the change. Every assessment has its own assignee, state, findings, and links to supporting analysis, and the parent ECR shows their combined progress. If you use Hierarchy (Workspace Settings > Work item types > Hierarchy), place the ECR type one level above the assessment type so every assessment nests under its change.

Function
Assessment scope

Engineering

Structural performance, loads, fit, function, and affected design requirements

Quality

Inspection criteria, acceptance requirements, and verification needs

Manufacturing

Tooling, assembly instructions, work in progress, and inventory

Product safety

Relevant hazards and the need for further safety analysis

Supplier and program

Supplier implications, schedule, customer obligations, and effectivity

In the BRK-204 example, Engineering finds that the new hole pattern needs additional structural analysis, Manufacturing identifies a tooling change, and Quality drafts revised inspection requirements.

Plan for customer notification

Changes that affect customer requirements need customer notification before implementation. Use the customer impact property to flag ECRs that meet your notification criteria, and add a notification task to each flagged ECR so the notice, its timing, and its recipient are tracked alongside the change. Where the customer or design authority has to approve the change, that approval follows your contractual process and its reference is recorded on the ECR.

Confirm the ECR is ready for a decision

Before ECR-027 moves to its decision state, the change coordinator confirms that:

  • Every required assessment is complete and accepted.
  • Open risks have an owner and a recorded disposition.
  • Customer notification requirements have been evaluated.
  • A versioned assessment package with the proposal, technical conclusions, supporting reports, and any conditions is referenced on the ECR.

The authorization section below shows how transition conditions can check the recorded status of these items before the ECR moves on, while the technical judgment behind each one stays with your designated reviewers.

Authorize the change through named approvers

Each ECR decision needs defined approval authority and a record of who approved the change, based on which evidence, and under what conditions.

Configure the ECR workflow

With Workspace Governance enabled, create a shared workflow under Workspace Settings > Workflows and apply it to the ECR Work Item Type. For example:

Submitted → Initial review → Impact assessment → Awaiting decision → Approved for ECO planning

Configure rejection, withdrawal, and reassessment routes alongside the main workflow. Four settings establish the controls:

  • Governance mode: Set the ECR type to Required so every project uses the designated workflow.
  • Allow new work items: Keep this enabled for Submitted and disable it for other states so ECRs enter through intake.
  • Transition permissions: Restrict each transition's by field, which defaults to All, to authorized members. Configure at least one flow for every state, including reassessment, withdrawal, and closure, to define the permitted routes.
  • Change history: Use View change history to track changes to workflow states, transitions, and approvers, including who made them and when.

Configure approvals around your decision authority

Approval flows define who can approve or reject an ECR at each decision state. Assign named approvers with project work-item editing permissions and include them in the ECR's Audience if Work Item Security applies. Plane Academy's approvals walkthrough covers the setup.

Choose the approval structure that matches your procedure:

  • One authorized decision: Add an approval flow to Awaiting decision, routing approval to Approved for ECO planning and rejection to reassessment.
  • Separate functional decisions: Chain approval states for Engineering, Quality, and Program, each with its own named approvers and rejection route.

Awaiting decision → Engineering approval → Quality approval → Program approval → Approved for ECO planning

Each state requires a separate decision from one of its listed approvers. While approval is pending, authorized approvers see Approve and Reject, while other users see Approval pending. Plane records each decision and resulting state change in the ECR's activity history.

If rejected, the ECR returns to reassessment. The coordinator addresses the findings, references the updated assessment package, and resubmits it for approval. Attach prerequisite checks to the return transition so they run again before the next decision.

Pair approvals with your decision evidence

  • Separation of duties: Keep change authors and editors off the relevant approver lists. From v4.0.4, a Runner pre-validation script can compare the acting approver with the ECR creator and stop a matching decision.
  • Decision rationale: Record approval reasoning and conditions as comments. A Runner check can also require a stage-specific rationale property before an approval or rejection proceeds.
  • Controlled records: Reference the versioned assessment package and any formal CCB authorization on the ECR, while preserving the authoritative evidence and signatures in your controlled records system.

Check prerequisites with transition conditions

Enterprise Grid supports JavaScript or TypeScript conditions through Plane Runner:

  • Pre-validation: Checks prerequisites before configured transitions or approval decisions. A script returning success: false with a clear message blocks the action and displays the reason on supported versions.
  • Post-action: Runs after a successful transition to update properties, add comments, create linked work items, send notifications, or call external APIs.

For ECR-027, configure pre-validation to check required properties, completed assessments, and the versioned assessment package before entering Awaiting decision. Attach the condition to the approval flow as well, so these prerequisites are evaluated when an approver acts.

Runner can also support PLM or QMS checks through permitted endpoints. Administrators configure outbound access through the Runner service's allowlist, and v4.1 supports encrypted workspace secrets for credentials.

Approval of the ECR authorizes ECO planning. The revised engineering definition proceeds through the organization's PLM release process before implementation. See Plane's Workflows documentation and Runner documentation for configuration details.

Implement against the released configuration

Approval to proceed and authorization to build are separate gates. In the example, the Rev D drawing can be in work while Rev C is still the released definition, so anything that touches production waits for the Rev D release and an effectivity decision.

Configure the ECO Work Item Type

Create an Engineering Change Order (ECO) Work Item Type and link it to the originating ECR with Plane's Implements relation, available when timeline dependencies are on. For BRK-204, ECO-019 connects the authorized change in ECR-027 to the implementation work. Enterprise Grid also supports custom relations under Workspace Settings > Relations for organizations that want relationship names aligned with their engineering procedures.

ECO property
Purpose

ECO reference

ECO-019

Related ECR

ECR-027, connected through the Implements relation

Authorized scope

Reference to the approved change

Implementation owner

Person coordinating execution

Target revision

Proposed Rev D

Technical release reference

The released drawing or configuration in PLM

Effectivity reference

Applicable serial numbers, lots, or production configurations

Verification status

Progress toward the required closeout

A post-action script on the ECR's approval can create ECO-019 in the implementation project with the relation already in place.

Gate implementation on the technical release

A workflow for ECOs could run:

Implementation planning → Awaiting technical release → Authorized for implementation → In implementation → Verification and closeout review → Closed

The transition into Authorized for implementation can be restricted to your configuration manager, with a Runner pre-validation script checking the required technical release and effectivity references. Where the deployment permits connectivity to your PLM, the script can also query the authoritative release status as part of the same validation. In self-hosted and air-gapped environments, administrators add the permitted PLM endpoint to Runner's outbound allowlist.

The release itself and the authorization to build stay with your PLM release process and production controls, and the ECO carries the references that show both are in place.

Coordinate implementation across functions

Implementation tasks sit under the ECO as sub-work items with their own owners and dependencies. For BRK-204, they typically cover:

  1. Updating and releasing the engineering drawing through PLM or PDM.
  2. Completing any additional engineering analysis or qualification activities.
  3. Revising tooling, manufacturing instructions, and supplier documentation.
  4. Updating inspection requirements and verification plans.
  5. Addressing affected inventory, work in progress, and configuration effectivity.

Blocked by relations make the sequence visible to every owner. The manufacturing instruction update, for example, shows the Rev D drawing release as its blocker, so the implementation coordinator can see what is holding each task. The engineering release, configuration baseline, and effectivity decisions themselves stay under your established engineering controls.

For a related use case, see How manufacturing teams use Plane.

Verify the change and retain the evidence

A change closes once the implementation is verified and the record chain from the original finding to the released configuration holds together for whoever audits it next.

Define verification and closeout criteria

Verification for BRK-204 may include dimensional inspection, structural analysis or test, interface checks, production process verification, and first article inspection where it applies. Add each one as a verification task under the ECO with its owner and acceptance criteria.

Before ECO-019 moves to Closed, the designated reviewer confirms that:

  • Required implementation and verification activities are complete.
  • Applicable technical evidence has been reviewed and accepted.
  • Released configuration and effectivity references are on the ECO.
  • Affected inventory and supplier actions have been addressed.
  • Outstanding issues have an authorized disposition.

If verification turns up an issue or the approved scope changes, send the ECO back through your reassessment route for reauthorization before it closes.

Trace the change from issue to released configuration

For the bracket change, the record chain runs:

NCR-014 → ECR-027 → Assessment package → Authorized decision → ECO-019 → Implementation tasks → Verification evidence → Released configuration reference

Relations, properties, and activity history let a reviewer move along this chain starting from any record in it.

Know where each record lives

Record
What it captures

Work item activity

Changes to ECR and ECO properties, state transitions, and each approve or reject action with the approver and resulting state

Workflow change history

Changes to the workflow's states, transitions, and approvers, including who added each approver and when

Workspace audit log

Authentication, membership, permission, workspace settings, webhook, and API token events

Project audit log

Project configuration, membership, permission, and deletion events, including applicable project-level workflow changes.

The audit log is append-only and cryptographically chained within each workspace, so entries cannot be edited or deleted, including by admins. Workspace Admins and Owners can filter, search, and export it to CSV or Excel, or as JSON through the API, and project audit logs give Project Admins the view for their own project. See Plane's audit log documentation for the full event list.

Work item activity, including every approve or reject action, has no time-based expiry while the ECR or ECO exists, including after archiving. From v4.1, a deleted item moves to Trash with its history intact and gets it back when restored. Instances can be set to purge Trash after a retention period, so export a change record's activity through the Plane API before deleting it, and file it alongside the released documentation in your QMS.

Track open changes

Saved views that combine work item type, state, assignee, and custom properties give engineering and quality managers a live list of ECRs awaiting decision, open assessments, ECOs blocked by a dependency or waiting on the technical release, and verification tasks still open. With workspace-level work item types turned on, the same filters work in workspace views across every program.

Plane Query Language (PQL) handles more specific questions, such as every ECR for a given part number still in impact assessment, by combining type, state, and custom properties in one query. Dashboard widgets take the same filters in their own filter panel, so each chart can track a single change type, state, or part family.

Evaluate the configuration with a representative change

Run a representative engineering change from intake to closeout to see how Plane fits your procedure. Before the trial, consider three areas. Enterprise Grid is the baseline for this guide; see Plane's pricing page for plan details.

Access, integration, and deployment

  • Access control: Enterprise Grid provides custom roles, permission schemes, and Work Item Security through Audiences applied to individual items or Work Item Types. Only active audiences restrict visibility, and item-level audiences override type-level settings.. Workspace Owners and Admins retain access, as do assignees and subscribers, while Project Admins need access through an Audience. Validate reviewer and approver permissions against your procedure using Plane's roles and permissions guide.
  • PLM and QMS integration: Plane's REST API, webhooks, and Runner scripts support custom integrations with engineering and quality systems. Define data ownership, authentication, synchronization, and failure handling for each connection.
  • Deployment: Plane supports Cloud, Commercial self-hosted, and Airgapped deployments. The capabilities in this guide are available in self-hosted and air-gapped builds from v4.0, with v4.1 or later recommended. Approver checks and custom blocker messages require v4.0.4; encrypted Runner secrets and Trash restore require v4.1. Runner starts by default with Docker Compose but requires services.runner.enabled in Helm. Air-gapped deployments use version-specific offline licenses, and feature availability depends on Enterprise Grid licensing.

What the demonstration should prove

Using BRK-204 or a recent change of your own, the technical team should be able to show:

  1. Change identification: An ECR captures the part, revision, source, and technical references your procedure requires.
  2. Assessment coordination: Engineering, Quality, and Manufacturing reviewers manage their assessments and supporting information on the ECR.
  3. Workflow enforcement: Demonstrate how configured transition conditions and approval controls handle incomplete prerequisites, unauthorized decisions, and the update paths used in your engineering change process.
  4. Authorization: Separate approval states, named decision-makers, rejection and resubmission, and a clear home for your CCB's formal authorization record.
  5. Implementation control: The ECO stays connected to the authorized scope, released configuration, and effectivity.
  6. Traceability: Reviewers can retrieve the operational history and the authoritative supporting records.

The trial also sizes the configuration effort and confirms which steps stay in your existing engineering and quality systems.

Run your next engineering change in Plane

An engineering change process stands up to audit when the originating issue, the assessment, the decision, the implementation, and the verification evidence connect from end to end. Plane Enterprise Grid gives aerospace teams the Work Item Types, governed workflows, approval flows, transition conditions, and linked execution work to run that process across Engineering, Quality, Manufacturing, and Program teams, with PLM and QMS holding the controlled records.

The clearest way to judge the fit is to configure one change type against your own procedure, approval authority, and release controls, then run a real change through it.

Talk to sales to plan a technical demonstration covering ECR and ECO workflows, approval routing, implementation tracking, and PLM and QMS handoffs.

Frequently asked questions

Q1. Does AS9100 require a specific ECR/ECO workflow?

No. Each organization defines its own ECR and ECO structure, approval responsibilities, and supporting procedures to suit its products, contracts, and quality management system. The workflow in this guide is a starting point to configure around your existing change procedure.

Q2. Can Plane record approvals from multiple CCB members?

Yes. Give each function on the CCB its own approval state with its own named approvers, and chain those states after Awaiting decision in the ECR workflow. Each state needs its own decision from one of its listed approvers, and work item activity shows who approved or rejected at each stage. Formal CCB signatures, where your procedure requires them, stay in your controlled authorization record and are referenced on the ECR.

Q3. Can Plane check that assessments are complete before authorization?

Yes. Plane Runner pre-validation scripts check assessment statuses, required properties, and evidence references as an ECR moves through a transition or approval, and show the coordinator exactly what is missing. On v4.0.4 and later, a script that returns { success: false, message } shows that message to the user, and the check attached to the approval flow runs before every approve or reject decision, wherever it's made. Configure and test the checks against your own procedure, alongside the authorization controls it already defines.

Q4. Can Plane integrate with existing PLM and QMS systems?

Plane provides a REST API, webhooks, and Plane Runner scripts for custom integrations, and every ECR and ECO can carry references to controlled records in external systems. The right integration pattern depends on the interfaces your PLM and QMS expose, your network architecture, and your authentication requirements.

Q5. Can this workflow run on self-hosted or Airgapped Plane?

Yes. Plane offers self-hosted deployment and an Airgapped Edition on Enterprise Grid. Approval flows, transition conditions, Plane Runner, audit logs, and Work item security all ship in those builds from v4.0 onward, with v4.1 or later recommended so the approver check, custom block messages, encrypted Runner secrets, and Trash restore are all available. Your Enterprise Grid license determines which capabilities are enabled.

Recommended for you

View all blogs
Plane

Every team, every use case, the right momentum

Hundreds of Jira, Linear, Asana, and ClickUp customers have rediscovered the joy of work. We’d love to help you do that, too.
Plane
Nacelle