Back to Changelog

Embed media in the editor, PQL in Dashboards, and more | May 15, 2026

May 15, 2026

What's new

PQL in Dashboards

Use the full power of PQL inside Dashboards for precise, query-driven reporting.

Edit pages from Plane AI

Make edits to your pages directly through Plane AI without switching context.

Embed images and videos by URL in the editor

Drop in images and videos by pasting a URL directly. A floating upload modal keeps the flow uninterrupted while inserting media.

Set your comment submission shortcut

Pick the keyboard shortcut you want for submitting comments in your profile preferences and match how you already work.

Customer requests on the work item view

Surface and manage customer requests directly from the work item, with full context on a single screen.

Copy work items across projects in bulk

Select multiple work items and copy them to another project in a single action.

Gantt layout in Teamspaces

View Teamspace work items in a Gantt layout to plan timelines and dependencies at the team level.

Enhancements

  • Preview attachments inline from the work item without navigating away.
  • Export work items from workspace-level views with full filter support.
  • Copy link button added to Space pages.
  • Export any dashboard as a PDF snapshot.
  • Cleaner, more intuitive UI for the work item types settings.
  • RBAC now governs who can create dashboards at the workspace level.
  • Customize how weekends appear on the calendar layout from profile settings.
  • Toggle ascending and descending sort order on work item lists.
  • Copy ID button and a clickable identifier added to the work item creation toast.
  • Plane AI now handles estimates and archiving.
  • English labels are visible in the language selector dropdown.
  • Versioning added to cycle scheduling.
  • Workflow transition rules no longer block intake work item creation and updates.
  • Discarding a duplicate suggestion records the work items as not duplicates, improving future AI accuracy.
  • Delete AI-generated page summaries to keep full control over page content.
  • Created by column added to the spreadsheet layout.
  • GitHub issue sync preserves table markdown when importing.
  • Clearer column headers in user activity exports.
  • The importer dashboard tracks and displays start and end times for each job.
  • Theme changes apply instantly with no page reload.
  • The transfer modal sorts the current cycle to the top.
  • Polished comment block in the activity feed with an L-curve thread connector.
  • Relation functions accept multiple IDs in a single call.
  • Member API responses include role value and slug.
  • Polished board scrollbar behavior, workspace settings, and the workspace switcher.
  • Pi's PQL prompt now includes custom properties.
  • Charts are available in Pi's build mode.
  • Block page suggestions from Pi persist across navigation and page reloads.
  • Pi chat threads support pagination.
  • Cleaner app tile showcase in the integrations marketplace.
  • Due date colors use a tri-state system.
  • Unsupported file attachments show a centered Download CTA in the editor.
  • Filled toast icons for success, error, info, and warning states.
  • Translations added across multiple workflow screens.
  • Standardized the webhook deactivation email template.
  • The sidebar Try section is now context-aware.

Bug fixes

  • Suspending a workspace member removes them from page share invite lists.
  • Restored translations for the archived initiatives empty state.
  • Auto-schedule cycles payload corrected so cycles run as expected.
  • Resolved an out-of-memory issue from PageVersion description hydration.
  • Week numbers in the timeline view display correctly.
  • Workspace-level work item type properties appear correctly in published intake forms and edit views.
  • Custom properties in intake forms appear in the order defined in settings.
  • Guest users can no longer vote on items, and the activity store handles guest accounts safely.
  • Workspace-level grants are honored on activity and epic comment endpoints.
  • Invitation accept role grants are attributed to the inviter.
  • Demoting a workspace guest cascades to all project memberships.
  • Workspace invitations redirect new users to onboarding instead of dropping them directly into the workspace.
  • Unresolved workspace slugs return a 404 instead of crashing downstream.
  • The external work item create endpoint returns a clear TITLE_TOO_LONG error when titles exceed 255 characters.
  • Repositioned the sticky note drag handle to the top-center to avoid colliding with the editor title.
  • Disabled page drop behavior on Pro plan where it is not supported.
  • Sub work items sort correctly in ascending and descending order.
  • Clicking a parent work item opens it in peek view.
  • Suspended users no longer appear in the lead dropdown on releases.
  • Resolved GraphQL performance hotspots on workspace, state, and page resolvers.
  • Initiative and teamspace comments accept all expected file types including Markdown.
  • Profile pictures display correctly in email notifications.
  • Power-K shows the bulk-delete shortcut as a single Backspace key.
  • The Get started button refreshes correctly after onboarding completes.
  • The favourites quick-action button no longer overlaps the sidebar scrollbar for items with long names.
  • Issue export is correctly gated to users with the right permissions.
  • Date range filters in Pi's advanced search receive both boundary values.
  • Notifications load reliably after a missing slash in the request was corrected.
  • Reduced noisy update refresh prompts.
  • PQL filters are forwarded when exporting work items.
  • Kanban swimlane items appear under the correct state column.
  • Restyled the filter button in rich filters to match toolbar icon-button sizing.
  • Fixed filter button rendering in the dashboard configuration panel.
  • Resolved a rare conflict when two people update assignees or labels on the same work item at once.
  • Switching intake items mid-edit saves the title change to the correct item and clears the saving indicator.
  • Wiki collection branches load without over-fetching the sidebar.
  • Workflow default state resolves correctly in the create modal and Kanban group quick add.
  • Workspace-level views spreadsheet shows only the projects you are a member of.
  • Fixed pagination on long PDF exports, lazy-registered CJK fonts to reduce memory use, and improved real-time progress in the export modal.
  • Custom property values are saved on work items created from project templates.
  • Custom property sort order is preserved in project templates.
  • Cycle and module columns are hidden in the epic spreadsheet layout.
  • Corrected advanced filter alignment.
  • Customer and customer request IDs are returned in work item list responses.
  • The collection page supports full pagination, filtering, and search.
  • Corrected padding in the initiatives property panel on the project overview.
  • Icon alignment in link displays is corrected.
  • Bot accounts no longer appear in space views.
  • CSV export in the Analytics users tab downloads the complete users table.
  • Resolved a race condition when saving customer descriptions.
  • Sign-up is allowed for users with matching IdP groups via group sync mappings.
  • Pre-selected modules are linked to work items when creating a project from a template.
  • Archived initiatives are excluded when associating initiatives with projects.
  • Fixed scroll behavior in the page assets pane.
  • Restored the Transfer work items CTA on the cycle list view.
  • Corrected modal close logic for math blocks and mentions in the editor.
  • PQL filters work correctly on published views.
  • Clicking a work item menu in calendar layout no longer triggers a conflicting hover popover.
  • Clearer success toast messages for copy link actions.
  • Restored the missing page title on the project overview page.
  • New work item notification previews show the correct content.
  • Restored the correct background color for the order by section in display filters.
  • Initiative breakdown cards navigate to the correct Scope tab.
  • The archives page opens with the Epics tab selected when accessed from the project context menu.
  • Restored horizontal auto-scroll when dragging cards near the edges of the Kanban board.
  • Archived work items embedded in pages and wiki open in a read-only peek view.
  • Corrected module progress header casing and adjusted chart padding.
  • Linked pages in the activity trail open correctly and the page reference pill stays within its container.
  • Saving a draft work item with a template no longer shows a misleading creation failed toast.
  • The linked pages section stays open after you attach a page to a work item.
  • Long unbreakable strings in PDF and DOCX exports wrap correctly.
  • Inline page embeds in Confluence imports default to href links instead of being dropped.
  • Fixed workspace issue property deduplication.
  • Imports automatically enable Views, Parallel Cycles, Project Updates, and Workflows for the project.
  • Looking up work item types by name at the workspace level works correctly.
  • User emails are normalized before lookup during Jira imports.
  • Internal page links in Confluence imports are converted to wiki links.
  • Bitbucket Data Center webhook resolution is scoped to the workspace via connection ID.
  • Fixed nested zip wrapper validation in Notion imports.
  • Linear comment replies import as threaded replies.
  • Restored the edit_page_content tool in build and autopilot modes.
  • Fixed response truncation when using Bedrock-hosted models.
  • AI elicitation prompts are more concise, the icon is updated, and missing field data is filled more intelligently.
  • The action card for the epic feature toggle handles both enable and disable states.
  • AI-driven state changes respect configured workflows and valid transitions.
  • Date range filters in advanced search work correctly.
  • Corrected the page summary generation timestamp.

Recent Changelogs

Plane

Every team, every use case, the right momentum

Hundreds of Jira, Linear, Asana, and ClickUp customers have rediscovered the joy of work. We’d love to help you do that, too.
Plane
Nacelle